PSP’s & ASP’s

PSP’s & ASP’s

Mardix Rail can provide a full turn-key solution for Network Rail’s PSP/ASP requirements. Our designers will provide an initial solution to the Form A requirements and then develop and finalise the design with the client.

The Mardix Rail PSP or ASP solution includes:

  • IP55 Network Rail fully compliant enclosure inclusive of all internal domestics
  • ASP PADS approved Switchgear inclusive of PADS approved transformers
  • Setup and configuration of insulation monitoring systems and feeder protection
  • Redundant forced cooling and where required environmental controls
  • Provision for UPS requirements inclusive of battery systems
  • Full Factory Acceptance Testing (FAT) including full load testing
  • Delivery to Site
  • Site Acceptance Testing
  • Lifecycle Maintenance

Translate »